Search results
Air Handling Unit Results

Max
VES Max units offer a selection of supply, extract and heat recovery permutations, to meet a vast range of requirements and applications. These bespoke air handling units are manufactured in...
More >

Heatline
The Heatline brings versatility to existing and new ventilation installations. Intelligent control options can synchronise with a BMS or LCD room unit. Coupled with a thyristor, valve or actuator,...
More >

T-Line
The T-Line features low energy, premium efficiency fans with low SFPs for a wide range of applications and locations, ideal for areas with constant operating temperatures of up to 120 o C. Optional...
More >

Colourfan Twin Extract Acoustic
The Colourfan Twin Extract Acoustic premium efficiency, low noise extract unit, has been designed to fit any application and has undergone acoustic testing independently to BS EN ISO 3744:2010....
More >

Colourfan Extract Acoustic
The VES Colourfan Extract Acoustic high efficiency, low noise, small extract unit, has been designed to fit any application and has undergone acoustic testing independently to BS EN ISO 3744:2010....
More >
HVAC Project Results

Spares and Service
Spares and Servicing for your product
More >

AHU installation
Complete HVAC installation solutions for new and existing buildings.
More >

AHU refurbishment
Fan and AHU component replacements to improve reliability and performance.
More >

Flat pack AHU
Solutions to overcome on-site restrictive access.
More >
Case Study Results

West Berkshire Council
Installation of a flat pack heat recovery AHU with restricted site access.
More >

Bournemouth University
Delivering a comfortable, productive learning environment.
More >

Aberdeen Business School
Helping an award-winning university deliver system improvements and identify and implement exceptional energy savings.
More >

Vodafone data centre
Delivering energy savings for a multinational telecommunications company
More >

CBRE British Airways
VES helped achieve 608,328 kW energy savings at London Heathrow by completing two projects
More >
Insight Results

Building Bulletin (BB) 101 - Ventilation for school buildings
The Education and Skills Funding Agency has published a revised edition of BB101 at the end of 2018.
More >

Natural, mechanical and hybrid ventilation compared
The different solutions for ventilating a building generally falls into the following categories: Natural, Mechanical and Hybrid.
More >

Building Bulletin (BB) 93 - Acoustic design of schools
Independent testing to BS EN ISO 3744:2010 helps to meet acoustic requirements for sensitive applications, including BB93; Building Bulletin (BB) 93 - School Acoustics.
More >

How does EC fan technology reduce energy consumption
EC technology is intelligent technology, using integral control to ensure that the motor always runs at optimal load.
More >

Energy efficient refurbishment
For buildings with faulty and deteriorating ventilation plant, the obvious choice may appear to be replacement, however there are many reasons why the repair or refurbish alternatives should also be...
More >
Solution Results

Ecovent Hybrid - EVH
Meets BB101 and OS overheat requirements, through mechanical ventilation mode.
More >

Ventilation for multiple areas
The ventilation approach within a school needs to take account for the comfort criteria, occupancy, noise and pollution sources, heating and cooling requirements, building layout and materials. There...
More >

Ecovent Counterflow - EVC
Heat recovery ventilation for the education sector.
More >

EC fan upgrades in HVAC equipment
Replacing belt driven fans with EC plug fans leads to immediate proven reductions in energy usage, potentially by up to 70%.
More >

Improve building energy usage with an energy survey
Offering clients an energy survey can help determine if and where, replacement/refurbishment works would benefit them, by reducing their gas or electric consumption.
More >
Page Results

Terms of use
Terms of use Welcome to our website. If you continue to browse and use this website you are agreeing to comply with and be bound by the following terms and conditions of use, which together with...
More >

Energy Efficient Ventilation
Our expertise will reduce energy costs Air handling and ventilation units are responsible for consuming 40% of all building energy in the UK. Our energy business case will identify large energy...
More >

VES Warranty
VES care Your purchase is worth protecting with the very best care and cover. Equipment from VES has been designed for a long and trouble free life. VES Care provides you with peace of mind...
More >

Enquiry Form
VES Controls Introduction Products BlueSense Specials Controls Enquiry
More >

Solutions Home
Solutions VES solutions achieve optimal ventilation performance while keeping energy use as low as possible Areas include General ventilation and air-conditioning of offices, leisure...
More >
News Results

Will your air handling cope when you need it most?
Winter 2014 set to be 'coldest for century' Britain faces Arctic freeze in just 2 weeks
More >

VES recognised as one of the most innovative companies in the Central South
VES has been named as one of the regions' Innovative 20 by accountants and business advisers BDO LLP.
More >

VES Shortlisted for The Energy Awards 2015
We’ve been shortlisted for ‘Energy Efficient Building Project of the Year’ in The Energy Awards 2015. The awards recognise the achievements of companies leading the way in innovative energy...
More >

We've reached the finals of the 2016 edie awards!
VES has been shortlisted for ‘Energy Efficiency Product Innovation’ in the 2016 edie Environment & Energy Awards.
More >

ErP Technical Statement now available from VES
EU Ecodesign Regulation no 1253/2014 for Ventilation Units Lot 6 came into force on 1 January 2016. It has also been enacted into UK law by statutory instrument 2015 no 469. VES has produced a...
More >
Contact VES

Hampshire office
Head Office
Eagle Close, Chandlers Ford Industrial Estate, Chandlers Ford, Eastleigh, Hampshire SO53 4NF
More >

Birmingham office
Regional Office
Landmark Offices, 3 Brindley Place, Birmingham B1 2JB
More >

Glasgow office
Regional Office
2 West Regent Street, Glasgow. G2 1RW
More >

London office
Regional Office
Landmark, 99 Bishopsgate, London, EC2M 3XD
More >

Manchester office
Regional Office
WeWork, 1 Spinningfields, Quay Street, Manchester, M3 3JE
More >
Careers Results

Small Works Sales Engineer
Main duties Take incoming calls from customers Understand the specific customer requirements by telephone or email communication Prepare, revise and issue proposals,...
More >
 
Product PDF Results

No pages were found that match your search criteria.

PDF Download Results

No pages were found that match your search criteria.

Case Study Results

No pages were found that match your search criteria.

General PDF Results

No pages were found that match your search criteria.