Solution
West Oxfordshire District Council initially considered completely replacing the air handling unit with a new one. VES, however, was able to offer a more cost-effective refurbishment solution that incorporated current energy saving techniques. An added benefit was that pool downtime could be reduced to a few days rather than a few weeks.
VES completely refurbished the AHU in situ. This included the removal of inefficient belt drive fan assemblies and replacing them with new inverter controlled direct drive fans. Along with other upgrades, new face and bypass dampers were installed in the fresh air and return air paths. These are now controlled by a modern BlueSense™ control system, ensuring that both temperature and humidity are maintained at appropriate levels, whilst making the most of the latest in energy saving technology.
VES engineers with specialist knowledge of swimming pool ventilation design, worked closely with West Oxfordshire District Council. From the initial brief through to the refurbishment program of work VES provided assistance at all stages, including full commissioning to ensure the new system operated at maximum efficiency.