Solution
Utilising VES’ technical expertise, offering unique insights into improving air quality, the building operation and environmental impact, VES designed, supplied and installed a complete HVAC solution. The principle of a modern pool ventilation system is that dry ambient air replaces moisture laden pool air. As the existing pool hall did not have any mechanical ventilation, there was a requirement for a new air distribution system to be installed to ensure fresh air can be supplied and the moisture laden pool air can be exhausted to atmosphere.
Due to the restrictive access to the new AHU location, the new MAX bespoke swimming pool AHU with integral controls was supplied in flat pack format and re-built on site.
One of the double pane windows along the external wall was removed to create an entry point for the new supply and extract ductwork into the pool hall without a requirement for intensive builder’s work. The external supply ductwork was connected to air socks with directional nozzles within the pool hall to ventilate and heat the space effectively. The directional nozzles were positioned to ensure air was passed across the pool surface and the windows to minimise condensation.